Funding Mechanics
Europe Is Starting to Buy Industrial Decarbonisation by the Tonne
The €1 billion IF26 Heat Auction does not primarily reimburse equipment costs. Projects qualify first, then compete on the price of the emissions reduction they can deliver. Europe is moving from financing assets toward purchasing measurable industrial outcomes.
28 Sep 2026 · 22 min
A conventional industrial grant starts with the investment.
- How much does the equipment cost?
- Which expenditure is eligible?
- What percentage will the public authority fund?
The new Innovation Fund 2026 Heat Auction starts somewhere else.
It asks:
How much public support do you need to eliminate one tonne of CO₂?
On 24 September 2026, the European Commission published the final Terms and Conditions for the second EU-wide auction supporting the decarbonisation of industrial process heat.
The planned budget is:
€1 BILLION
financed through revenues from the EU Emissions Trading System.
The auction is expected to open in December 2026 and close in February 2027.
Successful projects can receive a fixed premium for up to:
5 YEARS
linked to the heat they actually produce, counted as a standard quantity of abated direct CO₂ emissions.
This sounds like another Innovation Fund call.
It is not. The funding logic is fundamentally different. Europe is increasingly asking industry not:
“What equipment do you want us to subsidise?”
but:
“What verified decarbonisation outcome can you deliver — and at what price?”
That is a much more consequential funding mechanism.
Industrial heat is an enormous emissions problem
Industrial production needs heat. Not room heating. Process heat.
The temperatures required to dry materials, generate steam, melt metals, process chemicals, manufacture glass, produce paper, prepare food and operate a wide range of industrial processes.
According to the Commission's IF26 Terms and Conditions, process heating accounts for approximately:
47%
of EU industrial energy demand
and around:
three quarters
of industry's direct CO₂ emissions, based on the underlying 2018 evidence used for the auction design.
Today, roughly 75% of industrial process heat still comes from fossil-fuel combustion, while electricity accounts for only around 4%.
That means industrial decarbonisation cannot be solved simply by building more renewable electricity.
Factories must also change how they produce heat.
And that is where the auction enters.
The technologies already exist
One of the more interesting aspects of the programme is that the Commission is not primarily financing speculative laboratory technologies.
Many of the eligible solutions already exist technically.
They include:
- industrial heat pumps
- electric boilers
- resistance heating
- electromagnetic and dielectric heating
- plasma heating
- thermal energy storage
- solar thermal
- geothermal heat
- hybrid combinations
For the first time in the heat auction, IF26 also includes certain innovative nuclear heat technologies, including light-water small modular reactors, advanced modular reactors, microreactors and potentially fusion-based heat solutions where the eligibility conditions are met.
So the bottleneck is not always:
Can industry produce heat without fossil fuels?
Often, it is:
Can the cleaner option compete economically with the fossil system already installed?
The auction is designed to close part of that cost gap.
This is not primarily a CAPEX subsidy
That distinction matters.
Suppose Factory A installs a €20 million industrial heat pump.
Factory B installs €40 million of electric heating equipment.
A traditional investment grant might focus heavily on those capital costs.
IF26 uses another unit of competition.
Applicants state the subsidy they require per unit of heat produced.
The application then converts that support request into a ranking value expressed as:
€/tonne CO₂ abated
using the auction's standard methodology.
Projects therefore compete on the public cost of achieving the emissions reduction.
The asset still matters. CAPEX still matters. Engineering still matters.
But the public authority is effectively purchasing:
DECARBONISATION PERFORMANCE
rather than reimbursing a predetermined share of a machine.
The public subsidy becomes a price
That changes how applicants need to think.
Imagine two technically mature projects. Both can replace fossil-fired industrial heat. Both pass the qualification requirements. Project A needs:
€80/tCO₂
of support.
Project B needs:
€150/tCO₂.
All else being equal within the relevant auction basket and after applicable ranking adjustments, Project A sits in a stronger competitive position.
The auction therefore asks the market to reveal:
What is the real price of industrial decarbonisation?
The Commission explicitly identifies price discovery and market formation as objectives of competitive Innovation Fund auctions.
That is important.
Policymakers do not have to decide in advance that every industrial heat project deserves exactly the same funding rate.
Developers reveal how much support they believe is required.
Competition does part of the price-setting.
First qualify. Then compete on price.
The auction is not simply:
cheapest number wins.
Projects must first pass a series of qualification tests.
The Commission will assess eligibility and project quality on a pass/fail basis, including technical maturity, financial maturity, operational maturity, compliance with the call conditions and the project's ability to reach implementation.
Only qualifying projects enter the price ranking.
The logic is therefore:
QUALIFY → PRICE THE ABATEMENT → RANK → FUND UNTIL THE BUDGET IS EXHAUSTED
IF26 also sets ceiling prices, which IF25 did not have: €400/tCO₂ in the low- and medium-temperature baskets and €800/tCO₂ in the high-temperature basket, applied after any bonus.
This matters because a very low bid from an unrealistic project is not useful.
The auction needs credible projects competing on price — not speculative promises.
There are actually three auctions inside the €1 billion
IF26 divides the budget according to process temperature.
Low-temperature heat
80–100°C
Budget:
€100M
Eligible projects must generally be at least 5 MWth and use qualifying heat pumps with COP above 1.5, direct renewable heat or nuclear heat.
Medium-temperature heat
100–400°C
Budget:
€600M
Minimum project size:
3 MWth.
High-temperature heat
above 400°C
Budget:
€300M
Minimum project size:
3 MWth.
This separation is economically important.
Producing 90°C heat is not the same engineering problem as replacing a 1,000°C fossil process.
Different technologies work at different temperature levels.
Different cost curves apply.
Different industries compete.
By creating separate baskets, the Commission avoids asking every industrial-heat technology to compete against fundamentally different systems on one undifferentiated price list.
The split is a starting allocation: if one basket's budget is under-used, it may be transferred to another.
The 80°C threshold opens a much larger industrial market
The previous heat auction focused on projects producing heat above 100°C.
IF26 lowers the threshold to:
80°C
for eligible low-temperature projects satisfying the specific technology and capacity requirements.
That sounds like a small change.
Commercially, it is not.
Many industrial processes operate within or near this lower temperature range.
Examples can include parts of food and beverage processing, washing, drying, pasteurisation, pulp and paper, chemical processes and other manufacturing activities.
Heat pumps become particularly interesting in these temperature bands because they can produce multiple units of usable thermal energy for each unit of electrical energy consumed.
Lowering the threshold therefore expands the addressable project pipeline.
The auction now rewards grid-friendly projects
This is where IF26 becomes particularly sophisticated.
Industrial electrification is beneficial for decarbonisation.
But if every factory turns on enormous new electric loads during periods when the grid is already under stress, the transition can create new problems.
More peak demand. More grid reinforcement. More redispatch. Higher system costs. And potentially more carbon-intensive marginal generation. The Commission therefore introduced a:
25% BID BONUS
for qualifying projects that meet defined flexibility or technology conditions.
IF25 rewarded flexibility only indirectly, through caps on subsidised load hours. IF26 moves the reward into the ranking itself.
This does not mean the project receives 25% more money.
It means the bid price is reduced by 25% for ranking purposes where the relevant conditions are satisfied.
That can materially improve competitiveness. It can also raise the volume that gets paid: projects that do not claim the bonus are limited to 70% of load hours; bonus projects are not.
If the bonus feature is not in place when the plant enters operation, the completion guarantee can be called.
What earns the 25% ranking advantage?
The Terms and Conditions allow the bonus where the project can demonstrate qualifying characteristics including, depending on the configuration:
- new electricity or thermal storage sufficient to cover 20% of relevant demand for four hours and become active within one hour
- a qualifying heat pump system with COP ≥1.5
- direct renewable heat
- qualifying nuclear heat
The objective is straightforward.
Europe does not want only:
CLEANER HEAT.
It increasingly wants:
CLEANER HEAT THAT WORKS WITH THE ENERGY SYSTEM.
That is a much stronger industrial-policy signal.
Decarbonisation and grid design are converging
This connects directly with themes we have explored in previous EUnita Insights.
Electrifying a factory is not only a factory-level decision.
It can change local grid demand, peak consumption, storage requirements, electricity procurement, renewable integration and infrastructure investment.
A project that installs thermal storage might heat material when electricity is abundant and use the stored heat later.
A heat pump can reduce electricity demand relative to direct-resistance technologies for the same useful heat output.
Solar thermal or geothermal can avoid some grid consumption altogether.
So industrial decarbonisation increasingly becomes:
PROCESS ENGINEERING + ENERGY-SYSTEM ENGINEERING.
The auction is beginning to price that distinction into funding competition.
A project can receive support for five years — but the price does not automatically rise
The fixed premium lasts for up to five years after entry into operation.
But IF26 provides:
NO INDEXATION
of the support amount.
That is a major commercial consideration.
Suppose the project's economics change because electricity prices increase, equipment becomes more expensive, financing costs rise, maintenance costs exceed expectations or industrial output falls.
The premium does not automatically adjust to rescue the business case.
This forces the bidder to price risk intelligently before submission.
The objective is therefore not:
Bid as low as humanly possible.
It is:
Bid as low as the project can sustainably operate.
Winning the auction with a financially unrealistic price is not success.
This makes financial modelling part of engineering
For IF26, the funding strategy cannot be prepared independently from the technical model.
The applicant needs credible assumptions for CAPEX, electricity consumption, thermal efficiency, load factor, energy prices, financing, maintenance, operating hours, production volumes, storage operation and replacement of existing fossil heat.
Change the technical design and the subsidy requirement changes.
Add storage and the project may receive a ranking advantage.
Improve heat-pump efficiency and electricity consumption falls.
Secure better electricity purchasing conditions and the funding gap changes.
The funding application therefore becomes an optimisation problem involving:
TECHNOLOGY
ENERGY
FINANCE and AUCTION STRATEGY.
That is very different from writing a narrative grant proposal.
There is a minimum €2.5 million investment threshold
The auction is open across industrial sectors and project sizes within its formal topic requirements, but applicants still need a minimum project CAPEX of:
€2.5 MILLION.
The newly installed capacity must also be located at one physical site; virtual pooling across different locations is not permitted.
That tells us something about the intended project profile.
This is not a small efficiency voucher.
It is designed for serious industrial transformation.
The Commission wants investments capable of changing how factories generate process heat at meaningful operational scale.
Individual grants can still become very large
IF26 keeps the maximum grant limits already used in IF25.
For low- and medium-temperature projects:
€100M maximum per bid
For high-temperature projects:
€250M maximum per bid.
That maximum does not imply projects will automatically receive anywhere near those amounts.
Funding depends on the bid price, production volume, five-year payment calculation, ranking and available topic budget.
But it demonstrates the potential industrial scale.
This is not simply a programme for adding one heat pump to an SME facility.
A high-temperature transformation of a major industrial plant can represent a very significant capital project.
Europe is forcing bidders to prove they can finish
A further feature makes the programme particularly serious.
Selected projects will need a completion guarantee equal to 6% of the maximum grant amount.
Applicants must already provide a letter of intent from an eligible financial institution concerning that guarantee as part of the proposal documentation.
Projects also face implementation milestones.
They must generally reach:
financial close within 2.5 years and entry into operation within 5 years
after grant-agreement signature.
If those conditions are not satisfied, the guarantee can be called under the applicable rules.
This is a powerful anti-speculation mechanism.
Europe does not want developers bidding aggressively simply to reserve budget.
It wants projects that can actually be financed, built and operated.
This is where auction funding becomes close to project finance
A conventional grant applicant can sometimes focus primarily on eligibility, innovation, impact and work packages.
IF26 demands something closer to infrastructure finance.
Before submission, serious applicants should already understand who will fund the remaining CAPEX, whether the balance sheet can support the project, which bank may provide the completion guarantee, how electricity will be purchased, what industrial production underpins the heat demand, whether engineering and permitting are sufficiently mature, and what downside scenarios do to project economics.
The application increasingly resembles a bankable investment proposition rather than a speculative innovation concept.
The first auction revealed a surprising result
The pilot IF25 Heat Auction received:
85 BIDS
requesting approximately:
€1.23 BILLION
in total support, according to the final results (the preliminary figure published in March was €1.4 billion).
Only 69 of those bids, asking for about €477 million, were admissible and eligible — less than half of the €1 billion budget.
The Commission ultimately invited:
65 PROJECTS
to grant-agreement preparation.
Those selected projects requested roughly €400 million in support and represented around 766 MW of thermal capacity, with expected production of approximately 16.3 TWh of decarbonised heat during their first five years of operation.
That result is interesting for two reasons.
First:
there is already a real European project pipeline.
Second:
the €1 billion budget was not exhausted: around €600 million was left unused.
The Commission's IF26 Terms and Conditions say industry feedback identified limited preparation time as the primary reason the first auction did not attract more than 85 proposals.
IF26 therefore provides a second round with earlier final rules and another €1 billion budget.
The first auction was undersubscribed where it counted
This is a useful nuance.
The gross numbers suggest strong competition: 85 bids asking for more than the €1 billion available.
But much of that demand never reached the ranking. 16 bids, worth about €758 million, were not admissible or eligible.
Counting only qualifying bids, demand was €477 million against a €1 billion budget, and no temperature basket used up its budget.
So price ranking played almost no part in IF25. The real test was qualification.
That does not make the second auction:
“easy money because nobody applied.”
IF26 gives applicants earlier final rules and more preparation time, and it adds ceiling prices, so the qualifying field may well be stronger. Projects still need to qualify, price competitively and meet demanding financial and technical requirements.
The better interpretation is that the European industrial-heat auction market is still forming.
And the Commission is learning from the first round.
The auction itself creates market intelligence
This is one of the least obvious benefits.
Suppose the Commission receives hundreds of industrial heat bids showing technology, temperature, capacity, support requested, geography and cost per tonne of abatement.
That dataset begins revealing where electrification is already competitive, where the funding gap remains large, which industries are easiest to decarbonise, which technologies clear at lower prices and which temperature ranges remain difficult.
In other words, the auction does not only distribute money.
It produces:
PRICE DISCOVERY.
That information can shape future policy.
The fixed premium also avoids reimbursing every cost line
Traditional grants can require significant administrative work around eligible expenditure, procurement, timesheets, equipment depreciation and cost documentation.
An output-based auction shifts part of the administrative logic.
The public authority is primarily interested in whether the supported heat is produced and the contractual output conditions are met.
The Terms and Conditions describe the support explicitly as output-based, tied to process heat production as the equivalent of the corresponding direct GHG abatement.
The policy question becomes:
Did the project deliver the industrial decarbonisation that was purchased?
That can simplify some aspects of support while increasing the importance of metering, monitoring, verification and production performance.
Measurement becomes part of the financial instrument
This is another crucial distinction.
If payment depends on output, then measurement is not a reporting formality.
It becomes part of the economics.
The project must measure process heat production, relevant temperatures, operational output and other parameters required under the monitoring and verification system.
The instrument therefore works only if Europe can convert physical industrial activity into verifiable funding units.
In this case:
MWh of qualifying heat → standardised CO₂ abatement → public payment
That is what makes outcome-based finance possible.
One default carbon factor creates comparability
The IF26 design simplifies ranking by using a common reference based on natural gas emissions.
The auction applies a standard factor corresponding to natural gas at 90% efficiency — 0.224 tCO₂ per MWh of heat — when translating supported process heat into direct CO₂ abatement for auction purposes.
This is important because factories currently use different fuels.
Coal replacement may avoid more direct emissions per unit of heat than natural gas replacement.
Oil differs again.
Without standardisation, projects could receive a ranking advantage simply because the fossil fuel they happen to replace has a higher carbon intensity.
The common reference makes bids more comparable.
The auction is trying to price:
THE CLEAN HEAT SOLUTION
rather than merely reward the dirtiest starting point.
Nuclear heat entering the auction is strategically notable
IF26 also marks another significant policy development.
Certain innovative nuclear technologies are now eligible to compete for industrial heat support.
This does not mean the EU is awarding an SMR project today.
The call is expected to open only in December, and the final project pipeline does not yet exist.
But it indicates that the Commission increasingly views industrial heat decarbonisation as a technology-neutral outcome problem within defined eligibility rules.
Electrification can compete. Renewables can compete. Innovative nuclear heat can compete. Hybrid solutions can compete. The outcome being purchased is:
DECARBONISED INDUSTRIAL HEAT.
That is an important shift from funding one predetermined technology pathway.
Not everything is eligible
The auction also draws clear boundaries.
Among the excluded activities are electric arc furnaces for steelmaking; electrolysis processes such as certain aluminium applications; heat intended primarily for space heating; heat sold into district-heating systems; and heat for fuel production based on non-recycled fossil feedstocks.
Biomass and hydrogen heat are also outside the defined eligible heat technologies for this auction.
This matters for applicants.
The call is broad across industrial sectors.
It is not broad across every decarbonisation technology.
The project has to fit the specific outcome and technology architecture established by the auction.
Auction-as-a-Service adds another funding layer
Member States and other EEA countries can also add national money through the Innovation Fund's Auction-as-a-Service mechanism.
The concept is elegant.
A project submits:
ONCE
to the European auction.
It may fail to obtain central Innovation Fund support because the EU budget clears before its bid.
But if its country has provided additional national funding through Auction-as-a-Service and the project meets the relevant requirements, it may still be supported using that national budget.
The country benefits from the EU evaluation and the common auction methodology, although its national top-up still needs State-aid approval.
The applicant avoids preparing an entirely separate national competition.
This is another example of European funding moving from:
27 PARALLEL SCHEMES
toward:
SHARED FUNDING INFRASTRUCTURE.
Europe can discover one price while countries add their own budget
That creates an interesting market design.
A Member State interested in accelerating industrial electrification does not necessarily need to invent its own ranking methodology, its own application portal, its own technical evaluation process and its own competitive auction.
It can use the European market mechanism.
That means:
EU rules establish the competition.
National budgets can expand the number of funded projects.
The resulting bid prices remain comparable across a broader geographic market.
For industrial policy, this could become a powerful model.
This is a pilot for something much larger
The €1 billion auction is significant on its own.
But the Commission explicitly describes the industrial heat auctions as pilots for the proposed:
INDUSTRIAL DECARBONISATION BANK
The Bank aims to provide:
€100 BILLION
in funding for industrial decarbonisation, under the wider Clean Industrial Deal architecture.
That makes IF26 strategically important.
Europe is testing not only which industrial heat projects deserve funding.
It is testing how a much larger future decarbonisation financing system might allocate capital.
If auctions prove cost efficient, scalable, administratively manageable and capable of producing credible price discovery, the mechanism can potentially expand.
The future industrial bank may not behave like a bank
The name “Industrial Decarbonisation Bank” can create the wrong image.
People may imagine companies apply for a loan, the Bank conducts credit analysis and money is lent.
But the emerging architecture could involve multiple instruments.
Auctions. Grants. Guarantees. InvestEU financing. Other EU and national resources.
The IF heat auctions demonstrate that part of the future system may behave less like conventional lending and more like:
A MARKETPLACE FOR DECARBONISATION OUTCOMES.
Industry offers: tonnes avoided. Europe offers: a price signal and public support. Competition determines which projects clear.
That is a very different funding model.
Europe is learning to purchase outcomes rather than promises
This may be the most important Funding Mechanics lesson.
A grant proposal usually contains a promise.
- We will build this plant.
- We will develop this technology.
- We will demonstrate this system.
Output-based funding goes further.
It asks:
- What did the system actually produce?
- How much fossil heat did it displace?
- How much qualifying clean heat was delivered?
- How much direct CO₂ abatement corresponds to that output?
The support then follows the measured outcome.
That aligns public payment much more closely with real-world delivery.
This changes proposal strategy completely
For EUnita clients considering the IF26 Heat Auction, the workflow should not begin with:
Let's write the application.
It should begin with:
Can we build a competitive industrial project?
A serious pre-bid assessment should include:
1. Technical architecture
Which heating technology? Which temperature basket? What MWth? What operating profile?
2. Existing fossil baseline
What industrial heat is being replaced? How stable is the underlying demand?
3. Electricity / energy strategy
Grid connection? PPA? On-site generation? Storage? Peak-hour exposure?
4. Financial model
CAPEX? OPEX? Electricity price? Financing cost? Expected load factor? Minimum sustainable premium?
5. Flexibility strategy
Can the project qualify for the 25% ranking bonus?
6. Bankability
Can it reach financial close? Can it secure the 6% completion guarantee?
7. Auction strategy
How low can the support request go without destroying the investment case?
Only then should the submission be optimised.
Good writing cannot repair an uncompetitive €/tCO₂
This is the defining difference from many conventional EU calls.
A beautifully written proposal cannot overcome weak project maturity, poor economics, an unrealistic bid or inability to finance the investment.
Once the project passes the qualification stage, the ranking is fundamentally price based, after the applicable ranking adjustment.
That turns the consultant's role into something broader than proposal writing.
The work becomes project structuring, financial modelling, engineering challenge, energy-market analysis and competitive auction strategy.
This is much closer to:
TRANSACTION ADVISORY
than conventional grant writing.
The €1 billion is therefore not the most important number
The headline budget will attract attention.
But the more important number for each applicant will be something much smaller.
The number in its bid.
€/tCO₂
That one number compresses engineering, energy prices, technology performance, capital cost, operating assumptions, risk and commercial strategy.
Two projects can use similar equipment.
One may need twice as much public support.
That is the information Europe wants the auction to reveal.
This may be where EU funding is heading
Not every programme can use output-based auctions.
Frontier research cannot easily be priced per tonne.
A cultural project cannot be reduced to €/unit impact.
Early-stage deep tech often lacks measurable commercial output.
But where the objective is clear and quantifiable, auctions offer an increasingly attractive policy mechanism.
Renewable hydrogen:
€/kg
Industrial heat:
€/tCO₂
Potential future markets could apply related logic wherever public authorities can define a measurable output, a credible verification method and enough competition.
This is funding becoming market design.
Europe is no longer only funding the machine
This is what makes IF26 a genuinely important development.
Europe still cares about the heat pump, the storage system, the electric boiler, the solar thermal installation, the SMR and the industrial equipment.
But it increasingly wants to know what those assets deliver.
The investment is the means. The decarbonisation is the product. That changes the funding conversation from:
How much does your project cost?
to:
How much does your project's impact cost?
And that may be one of the most important changes happening inside European clean-tech finance.
The €1 billion IF26 Heat Auction is still a relatively early experiment.
But it sits directly on the pathway toward a proposed €100 billion Industrial Decarbonisation Bank.
So the real test this December is larger than industrial heat.
Europe is testing whether public money can be allocated more like a market:
QUALIFY THE PROJECT → PRICE THE OUTCOME → COMPETE → DELIVER → GET PAID
That is a fundamentally different kind of EU funding.
And for industrial projects, it may increasingly become the one that matters.
EUnita takeaway
For industrial companies, energy developers and technology providers, the IF26 Heat Auction should be treated as an investment and auction exercise first, application exercise second.
The core preparation chain is:
PROCESS HEAT NEED → TECHNOLOGY → ENERGY STRATEGY → CO₂ ABATEMENT → FINANCIAL MODEL → €/tCO₂ BID → BANKABILITY → VERIFIED OUTPUT
The strongest project is not necessarily the one with the largest CAPEX or the most sophisticated technology.
It is the project that can credibly deliver meaningful industrial decarbonisation at a competitive and financeable public-support price.
Sources
- Commission publishes terms and conditions for €1 billion industrial heat decarbonisation auction — European Commission, 24 September 2026
- IF26 Heat Auction — European Commission
- Innovation Fund IF26 Heat Auction — Terms and Conditions — 24 September 2026 (PDF)
- Innovation Fund 2025: Heat Auction Results Publication — May 2026 (PDF)
- Commission awards €400 million to European projects to decarbonise heat production — IP/26/1134, 22 May 2026
- IF25 Heat Auction — European Commission
- Clean Industrial Deal — European Commission
Go to the source: Official source: European Commission — 24 September 2026; IF26 Heat Auction Terms and Conditions
This article is general information compiled from public EU sources and may change over time. Always confirm current details, deadlines and eligibility on the official programme page before applying.