Horizon Europe · Cluster 5 · IA · lump sum
Horizon Europe CL5: improved system design for innovative PV applications (EUPI-PV). An Innovation Action for consortia that demonstrate agrivoltaics or offshore/nearshore PV at 5 MW or more
About €7.5 million per project to demonstrate agrivoltaics or offshore PV (5 MW or more in total). Deadline 1 December 2026, 17:00 Brussels time.
Status: Closing soon · Deadline: 1 Dec 2026, 17:00 Brussels time
- €7.5 million — expected EU contribution
- €30 million — topic budget, about 4 projects
- TRL 7–8 — expected at the project end
Call facts
- Grant: Around €7.5 million per project; other amounts allowed
- Funding: Lump sum; 70% rate, non-profits up to 100%
- Who: Any legal entity, in a consortium
- Where: EU Member States, associated countries, overseas territories
- Partners: 3+ independent entities, 3 countries, 1+ in the EU
- TRL: Any start TRL; TRL 7–8 expected at the end
- Effort: Very high
HORIZON-CL5-2026-11-D3-14 · WP 2026–2027 · run by CINEA
At a glance
A good fit only for a consortium that already has a nearly complete proposal and can deliver agrivoltaic or offshore/nearshore PV demonstrators of at least 5 MW in total; the deadline is 1 December 2026, 17:00 Brussels time (18:00 in Romania).
- What it funds: one of two areas per proposal, agrivoltaics (PV and crops on the same land) or offshore/nearshore PV. The work covers system modelling, components, climate resilience, standards, permitting and demonstrators of at least 5 MW in total, in different EU climate or sea zones. Activities may start at any TRL and are expected to reach TRL 7–8.
- Money: €30 million for around 4 projects, about €7.5 million each, paid as a lump sum fixed from a detailed budget table. The rate is 70%, and up to 100% for non-profit entities.
- Who can apply: any legal entity, in a consortium of three independent entities from three countries, one of them in an EU Member State. Romanian entities are eligible. Entities established in China cannot take part in any capacity.
- The partnership link: funded projects are expected to report results to EUPI-PV for its KPIs. Membership is not a condition of applying.
- The portfolio rule: at least the two highest-ranked agrivoltaic proposals and the two highest-ranked offshore/nearshore proposals are funded if they pass all thresholds. If four projects are funded, the rule can fill all four places with the two best proposals of each area (EUnita reading). No applicant figures are published.
- Who can still use this deadline: a consortium with a written proposal that needs a last check of the rules, or a partner joining in the last days (it needs an EU Login account, a PIC and a line in the budget table). A team starting from zero should prepare for the next round instead: the Work Programme has no repeat of this topic. The next EUPI-PV topics cover other subjects (opening 3 December 2026 with a deadline of 31 March 2027, and opening 4 August 2027 with a deadline of 1 December 2027), and later calls are not published.
Key dates
- 4 Aug 2026 — Call opened
- 1 Dec 2026 — Deadline, 17:00 Brussels (18:00 Romania)
- May 2027 — Results (indicative, about 5 months on)
- Aug 2027 — Grant signature (indicative, about 8 months on)
Is it for you?
Good fit
- A consortium that already has a nearly complete agrivoltaic proposal, with demonstrators in different EU climate zones (the topic does not give a minimum number) and a settled permit plan
- Developers and installers of floating, nearshore or offshore PV who can build demonstrators, alone or co-located with offshore wind
- Makers of modules, mounting structures, trackers, floaters, cables and inverters who need to prove components at scale (TRL 7–8)
- Research bodies and universities in agronomy, energy-yield modelling, marine engineering and standardisation
- SSH experts, farmers' organisations, public authorities and insurers who can support permitting, acceptance and site access
Not a fit
- Single organisations or consortia from fewer than three countries
- Teams with no draft and no consortium yet: the deadline is too close, so prepare for the next round
- Projects on livestock co-location or on inland waters (reservoirs, dams, lakes): the Portal answers put them out of scope
- Proposals that rely on existing plants without innovative refurbishment: they do not count towards the 5 MW (Portal answer 102686)
- Consortia that rely on entities established in China in any capacity, subcontractors included
- Proposals that mix both areas: a proposal must pick one
Eligibility checklist
- At least three independent legal entities as beneficiaries, each in a different country: one in an EU Member State, the other two in Member States or Horizon Europe associated countries. Affiliated entities do not count towards the minimum.
- One area only: a proposal must address agrivoltaics or offshore/nearshore PV, not both.
- Demonstrators: the Work Programme asks for at least 5 MW altogether, at different EU climate or sea zones. A single demonstrator below 5 MW is fine if all demonstrators together reach 5 MW (Portal answer 91249). Portal answer 102687 says that, in principle, the 5 MW refers to newly constructed (innovative) PV capacity; answer 102686 says that an existing plant that is not innovatively refurbished does not count, and answer 84564 describes a complete rebuild of an existing site as a very rare case.
- Out of scope (Portal answers): livestock co-location, because the topic names crops, and inland waters such as reservoirs, dams and lakes.
- Design, permits and build (the Portal answers are not consistent): answers 103297 and 103299 say that sites must be designed, and permits obtained, within the project, and answer 103300 that construction and commissioning follow once permits are obtained. Answer 84563 (changed 17 November 2026) accepts new agriPV plants at "Ready to Build" stage if they are not yet commissioned or in operation. A consortium whose plant is already designed or permitted should ask CINEA in writing before the deadline (EUnita reading).
- TRL: any starting level; TRL 7–8 expected at the end. The topic also requires a strong business case and an effective contribution of social sciences and humanities (SSH) experts.
- If the project uses satellite earth observation, positioning, navigation or timing data, it must use Copernicus and/or Galileo/EGNOS.
- Entities established in China cannot take part in any Innovation Action, in any capacity: as beneficiaries, affiliated entities, associated partners, third parties giving in-kind contributions or subcontractors. Exceptions may be granted case by case for justified reasons (General Annexes, p. 7). The extra ownership-and-control restriction for Innovation Actions is not stated for this topic.
- Public bodies, research organisations and higher education establishments from Member States and associated countries need a gender equality plan at grant signature.
- Every beneficiary, affiliated entity and associated partner needs a PIC to submit; beneficiaries and affiliated entities are validated later, at grant preparation, and associated partners need no validation.
Our take
- Two new PV deployment areas: the topic targets bankable agrivoltaic and offshore/nearshore PV systems, with lower CAPEX and OPEX, higher energy yield, standards and a clear permitting route.
- Demonstration at scale: the grant pays for proof in the field, at TRL 7–8, across different EU climate or sea zones.
- Lump-sum money, with a catch: a lump sum at 70% (up to 100% for non-profits) is fixed from your budget table and paid per completed work package. The Portal answer on a 5 MW agrivoltaic demonstration plant says its construction cannot be entirely funded: only depreciation of equipment and assets, by project duration and share of use, is eligible.
- Partnership context: the topic implements the EUPI-PV partnership. Its partners other than the Union plan contributions of up to €240 million for 2025–2030 (unsigned memorandum copy); this is not a duty of applicants. Funded projects are only expected to report results to it.
How to win
- If your proposal is already written, use the remaining time for a rules check: one area only; at least 5 MW of demonstrators in total (the Portal answers are not consistent on plants that are already designed or permitted: ask CINEA in writing before the deadline); TRL 7–8 at the end; permits inside the project; a detailed budget table saved as .xlsx and listing beneficiaries in the same order as Part A; at most 45 pages. Each submission replaces the previous one, so submit early: the Online Manual advises submitting "as early as possible and at least 48 hours before the deadline" (p. 38). Derived estimate: 48 hours before 1 December 2026, 17:00 Brussels time is Sunday 29 November 2026, 17:00. After the deadline nothing can be corrected.
- If a partner is joining late, it needs an EU Login account and a PIC, a place in Part A and a line in the budget table. Public bodies, research organisations and universities from Member States and associated countries must have a gender equality plan at signature.
- If you are starting from zero, do not rush this deadline. The Work Programme has no repeat of this topic. Use the time to build a consortium for the next EUPI-PV topics (opening 3 December 2026, deadline 31 March 2027; opening 4 August 2027, deadline 1 December 2027) and watch the Portal for later calls. The EUPI-PV partnership can launch calls only until 31 December 2027, and its EU funding after 2027 is not decided.
- Choose your area with the portfolio rule in mind: at least the two highest-ranked agrivoltaic and the two highest-ranked offshore/nearshore proposals are funded if they pass the thresholds. EUnita reading: the competition is mainly inside your own area.
- Put effort into the Impact section: for Innovation Actions its score counts 1.5 times in the ranking. Show the business case, the routes to funding (the topic names possible funding sources, in particular the Innovation Fund) and the SSH work on permitting and acceptance.
- Plan the co-financing of your demonstrators from the start: the grant is a lump sum at 70% for most beneficiaries, and plant construction is not funded in full.
Documents to prepare
- Part A (online) and Part B (PDF, at most 45 pages in all) in the Funding & Tenders Portal submission system; the Portal form is used, not the standard template
- The detailed budget table (HE LS, Excel): saved as .xlsx for upload, work packages in the same order as Table 3.1a, beneficiaries in the same order as Part A
- A PIC for every beneficiary, affiliated entity and associated partner, and an EU Login account for each contact person
- A plan for exploitation and dissemination with a strong business case and the possible funding routes, including the Innovation Fund
- The SSH contribution and the permitting and standardisation work, written into the work plan
- A gender equality plan for public bodies, research organisations and higher education establishments from Member States and associated countries, valid at signature
- After selection: legal entity validation, a financial capacity check of the coordinator (normally from EUR 500,000 requested, except public bodies), a declaration of honour from each participant and a consortium agreement
Risks to weigh
- Time: the deadline is 1 December 2026, 17:00 Brussels time. It cannot be extended at an applicant's request, and no corrections or resubmissions are possible afterwards. Excess pages beyond 45 are made invisible.
- Portfolio rule and competition: around 4 projects are expected, and at least two agrivoltaic and two offshore/nearshore proposals are funded if they pass the thresholds. No figures on applicants are published.
- Demonstrator rules: at least 5 MW of demonstrators in total. The Portal answers are not consistent on plants that are already designed or permitted, so such a case should go to CINEA in writing before the deadline. Permitting delays inside the project can endanger delivery and the lump sum.
- Costs: plant construction cannot be entirely funded; equipment, infrastructure and other assets are eligible only as depreciation (Portal answer 103301). Ineligible costs in the budget table can reduce the grant, even after the project has ended.
- Lump sum: payment follows completed work packages, so an incomplete work package is not paid until it is completed; at the final reporting period a work package can be declared partially completed.
- China: entities established in China are not eligible in any capacity, including as subcontractors or in-kind third parties (exceptions may be granted case by case for justified reasons), and Chinese universities under the MIIT are excluded from every action.
- Results: for four years after the end of the action the granting authority may object to a transfer of ownership or an exclusive licence of results.
- Dates can move: the Director-General may delay the deadline by up to two months. Do not plan on it.
Official documents
- Official call page
- Where to apply
- Guidelines
- Templates / documents
- Work Programme
- Additional documents
- Full analysis (PDF)
Based on the Horizon Europe Work Programme 2026–2027, Part 8 (Decision C(2026) 6687/2 of 29 September 2026, topic text pp. 148–151) and Part 15 General Annexes, the Funding & Tenders Portal topic data and page (published 12 December 2025), the standard application form V5.1 (22 January 2026), the lump-sum model grant agreement V1.0 (1 November 2024), the detailed budget table V3.6, the Online Manual V1.3 (1 May 2026) and the 13 Portal answers on the topic, checked on 20 November 2026. Official updates prevail.