Horizon Europe · WIDERA · CSA · single-stage
Excellence Hubs: grants for networks of regional innovation ecosystems in Widening countries, coordinated from a Widening country such as Romania
Expected €1.5–4.5 million per project, at 70%, for hubs of two or more innovation ecosystems in Widening countries. Deadline 4 March 2027, 17:00 Brussels.
Status: Open · Deadline: 4 Mar 2027, 17:00 Brussels time
- €1.5–4.5 million — expected EU contribution
- 70% — of the project's eligible costs
- €100 million — topic budget, about 30 projects
Call facts
- Grant: Expected €1.5–4.5 million EU contribution per project
- Funding: Up to 70% of project costs; consortium covers 30%
- Who: Coordinator in a Widening country, Romania included
- Where: Ecosystems in Widening countries; other countries may join
- Partners: 2+ ecosystems in 2 Widening countries, 4 actor types each
- TRL: Not set; TRL 3–7 expected (topic Q&A)
- Duration: Up to 5 years
- Effort: Very high (EUnita rating)
HORIZON-WIDERA-2027-04-WIDENING-01 · Work Programme 2026–2027, part 11
At a glance
A good fit for Romanian universities, research institutes, clusters, regional authorities and established companies that can bring a full four-actor ecosystem, find a partner ecosystem in a second Widening country, and cover, as a consortium, the other 30% of the project's costs.
- What it funds: a hub that links at least two regional innovation ecosystems, with a joint research and innovation strategy, investment plans, a research work package kept in balance with the other activities and not the dominant part (no fixed percentage, Q&A 103466), and skills and knowledge-transfer activities.
- Who can apply: a consortium led by an entity established in a Widening country. Romania is on the list. Each ecosystem must sit in one Widening country and cover academia, business, regional or local public authorities and societal actors.
- How it pays: up to 70% of the project's total eligible costs, expected at €1.5–4.5 million per project (an estimate, not a cap), from a €100 million topic budget for about 30 projects. Small grants of up to €60,000 can go to SMEs and start-ups.
- The catch: a single stage, so the full proposal is due on 4 March 2027. The call funds new hubs, not follow-up funding of an existing or recently completed Excellence Hub (Q&A 109992), and the consortium's 30% share is audited. Earlier hubs were funded at about 100% of costs (derived from CORDIS); this call funds up to 70%.
Key dates
- 2 Sep 2026 — Call opened
- 4 Mar 2027 — Deadline, 17:00 Brussels (18:00 in Romania)
- Jul 2027 — Applicants informed (REA, indicative)
- Nov 2027 — Grant agreements signed (REA, indicative)
- Dec 2027 — Projects start (REA, indicative)
Is it for you?
Good fit
- Romanian universities and research institutes ready to lead a hub or to anchor a Romanian ecosystem
- Clusters and innovation agencies that already cover business, academia, public bodies and civil society and can act as an umbrella organisation
- Regional and local authorities that shape a smart specialisation strategy and want a place in a cross-border plan
- Established companies with at least two years of turnover that can anchor an ecosystem's business side
- Consortia that can cover the 30% share and manage a large, multi-country project for up to five years
Not a fit
- Organisations without a partner ecosystem in a second Widening country: two ecosystems are the minimum
- Hubs that already received Excellence Hubs funding and want follow-up funding
- Entities from non-Widening countries hoping to coordinate
- Consortia that cannot cover the other 30% of the project's eligible costs from own or other permitted resources
- Projects that mainly need equipment, infrastructure or construction, or whose research part would dominate the project
Eligibility checklist
- Coordinator: a legal entity established in a Widening country. Romania is on the Work Programme list. Private companies from an Associated Country can lead if that country is on the list.
- Ecosystems: at least two, from two different Widening countries. Each sits entirely in one country and has four kinds of actor: academic institutions, business entities, public authorities or authorised agencies at regional or local level, and societal actors. Societal actors must be neither commercial nor public administration (topic Q&A 103469).
- Two ways to show an ecosystem, never mixed: (1) one or more umbrella organisations as beneficiaries whose membership covers all four kinds of actor; or (2) individual beneficiaries for each of the four kinds. The Work Programme does not allow a combination (topic Q&A 103479 and 106254).
- An established business: with individual entities, at least one business per ecosystem must be established, with a proven operational turnover for at least two consecutive years at submission (WP11 pp. 54–55), shown by balance sheets or business reports attached in an EU official language. A topic Q&A (103472) words this as at least two years before the call publication, with significant income from commercial activity and not public funding. The documents do not say which date counts; the point is open.
- No official minimum number of beneficiaries: EUnita interpretation: two ecosystems of four kinds of actor each mean eight or more entities, unless an umbrella organisation covers an ecosystem. For complex ecosystems without an umbrella organisation, topic Q&A 103474 recommends at least two core partners per ecosystem, one research organisation and one established business, who sign the grant agreement; the other members are listed as associated partners. The documents do not say how this fits the four-category rule.
- Other countries: entities from non-Widening Member States and Associated Countries may join if needed to reach the expected impacts; a topic Q&A (103475) says this can only be a minor component. Entities from non-associated third countries can take part without EU funding, for example as associated partners (General Annexes pp. 4–5).
- New hubs only: the call funds new hubs, not follow-up funding of an existing or recently completed Excellence Hub (topic Q&A 109992).
- Costs: the EU pays up to 70% of the project's total eligible costs and the consortium covers the other 30%. An individual beneficiary may request up to 100% of its own eligible costs, as long as the total requested EU contribution stays within 70% of the total eligible costs (topic Q&A 109151). The proposal should explain how the other 30% will be secured and shared (WP11 p. 55; topic Q&A 108323). No formal proof of the 30% is needed at proposal stage, but it is checked during the grant. Indirect costs are a 25% flat rate of direct costs, excluding subcontracting and financial support to third parties (General Annexes p. 32).
- Research part: a distinct work package, in balance with the other activities and not the dominant part (WP11 pp. 56–57). No fixed percentage cap (topic Q&A 103466). Major equipment, research infrastructure and construction cannot be funded.
- Pilots and demonstrators: WP11 p. 57 says conceptual design and pre-planning of pilots and demonstrators must be financed by sources other than the EU grant, and topic Q&A 106253 repeats this. Topic Q&A 106251 says preparatory actions such as specification and pre-development of major equipment, pre-planning costs for infrastructures and feasibility studies "could be eligible for funding under this call". The documents do not say which prevails; do not rely on EU funding for this part until it is settled.
- Financial support to third parties: grants only, to SMEs and start-ups only, up to €60,000 each. The open calls must be published on the Portal and on the beneficiaries' websites, stay open for at least two months and have a clear European dimension (General Annexes p. 18). Not for pilots and demonstrators (topic Q&A 106253).
- Gender equality plan: public bodies, research organisations and higher education institutions need one at grant signature.
- Page limit: WP11 p. 54 sets 40 pages for this topic. The 25 pages in the Part B template and General Annex A are the generic CSA limit, and the 2025 annexes say 30. The Part B form in the submission system is binding (General Annexes p. 4); it opens only after a sign-in.
Our take
- Romania can lead: Romania is a Widening country, so a Romanian university, institute, cluster or regional body can lead. In the 25 earlier hubs on CORDIS none was led from Romania; 13 Romanian entities took part in 3 of them.
- Money for strategy and investment plans, not only research: the grant pays for a joint strategy, investment plans, skills and knowledge transfer, and a research package that must stay in balance with them.
- Small grants for SMEs and start-ups: up to €60,000 each can be passed on through an open call run by the hub.
- Regional and national authorities can help: they may join as associated partners if the conflict-of-interest rules for National Contact Points and Programme Committee members and their host institutions are respected, and the topic Q&A advises contact with national and regional funding agencies from the start about follow-up support (Q&A 109991).
- One submission: a single proposal by 4 March 2027, scored against three criteria, with no first stage.
- A larger own share than before: earlier hubs were funded at about 100% of costs on CORDIS (Derived estimate); this call pays up to 70% of the project's eligible costs, and the consortium's 30% is audited.
How to win
- Start with the ecosystem map. Name, for your region, the university or institute, the established business, the regional or local authority and the societal actor, or the umbrella organisation that covers all four.
- Find a partner ecosystem in a second Widening country early. The partner search on the Portal listed 178 announcements for this topic on 15 November 2026.
- Choose one route per ecosystem, umbrella or individual entities, and do not mix them.
- Show the 30% in plain words: which beneficiary pays what, from which source, and why it is credible. Keep the research work package in balance with the other activities, not the dominant part.
- Build the joint strategy on a common domain: either what the regional smart specialisation strategies share, or a European priority with its economic benefit. Show why joint European funding adds more than separate regional projects.
- Plan the pilots and demonstrators as design and pre-planning only, financed from other sources. The grant cannot buy major equipment, infrastructure or construction.
- Check the page limit in the submission system before writing: WP11 p. 54 sets 40 pages for this topic, and the Part B form in the submission system is binding.
Documents to prepare
- Part A, filled in online in the Funding & Tenders Portal, with a PIC for every beneficiary, affiliated entity and associated partner, and call-specific questions
- Part B as a PDF: Excellence, Impact, and Quality and efficiency of implementation, within the page limit the submission system shows (WP11 p. 54: 40 pages)
- Where individual entities show an ecosystem: balance sheets or business reports proving at least two years of operational turnover for the established business of each ecosystem, in an EU official language
- An explanation of how the other 30% of costs will be secured and shared among beneficiaries
- The information document on financial support to third parties, if grants to SMEs and start-ups are planned
- A written consortium agreement, mandatory unless the call says otherwise
- At grant preparation: legal entity validation, financial capacity check for the coordinator if it requests €500,000 or more (public bodies excepted), a declaration of honour, and a gender equality plan for public bodies, research organisations and universities
Risks to weigh
- Funding rate of up to 70%: the remaining 30% of the project's total eligible costs is an audit-controlled obligation for the consortium as a whole, and the proposal should explain how it will be secured and shared.
- The two-route rule: the Work Programme gives two ways to show an ecosystem and the topic Q&As say they cannot be combined, so a mixed set-up fits neither.
- Established business proof: balance sheets or business reports for the required years must be attached. WP11 says two consecutive years at submission; topic Q&A 103472 says at least two years before the call publication. The documents do not say which date counts; the point is open.
- Competition: in the 2023 call REA received 205 proposals for 12 hubs (about 5.9%, Derived estimate; 2023 call, not a forecast). The 2027 call funds about 30; the number of proposals is not found in the sources read.
- One submission only: there is no outline stage. Ties go first to proposals whose coordinator is in a Widening country not already coordinating a higher-ranked proposal.
- Page limit: 40 pages is the topic's figure (WP11 p. 54); 25 is the generic CSA limit and 30 is in the 2025 annexes the Portal links. The Part B form in the submission system is binding and opens only after a sign-in.
- Pilots and infrastructure: WP11 p. 57 and Q&A 106253 say the design and pre-planning of pilots is financed by sources other than the EU grant; Q&A 106251 says preparatory actions such as specification, pre-planning and feasibility studies could be eligible. The documents do not say which prevails, so do not rely on EU funding for that part until it is settled.
- Deadlines can move: the Director-General may delay the deadline by up to two months. Applicants cannot ask for an extension.
- Morocco: the Work Programme counts it only once it is associated, and the participating-countries list of 7 October 2026 shows it under transitional arrangements. Whether it counts as a Widening country now is open: check the Portal before relying on it.
- Hungarian public interest trusts: the General Annexes exclude them from funded roles while the Council measures stand. Council documents record a decision of 13 October 2026 lifting the measures; the annex text was not changed in the version read, so check the Portal before relying on it.
Official documents
- Official call page
- Where to apply
- Guidelines
- Templates / documents
- Work Programme
- Additional documents
- Full analysis (PDF)
Based on Horizon Europe Work Programme 2026–2027, part 11 (Decision C(2026) 6687/2 of 29 September 2026), the General Annexes 2026–2027 (part 15; the Portal Conditions tab still links the 2025 annexes), the Portal topic page and data file, the 27 topic Q&As (last modified 12 November 2026), the Horizon Europe CSA application form (Part A v3.0, Part B v5.1), the model grant agreement v1.2, REA's call page, CORDIS project records, the list of participating countries V4.2 of 7 October 2026 and Council documents 13519/26, 13568/26 and 14457/26 on Hungarian public interest trusts, checked on 15 and 16 November 2026. The effort and complexity ratings are EUnita's own. Official updates prevail. Image: European Research Area illustration, © European Union, 2024, licensed under CC BY 4.0.