Horizon Europe · NEB Facility · IA · lump sum
Horizon Europe NEB: innovative approaches for the spatial design of neighbourhoods. An Innovation Action for consortia demonstrating one public-space design approach in at least three neighbourhoods
About €5 million per project to demonstrate one inclusive public-space design approach in at least three neighbourhoods. Deadline 1 Dec 2026, 17:00 Brussels.
Status: Closing soon · Deadline: 1 Dec 2026, 17:00 Brussels time
- €5 million — expected EU contribution
- €10 million — topic budget, about 2 projects
- At least 3 — neighbourhoods, urban to rural
Call facts
- Grant: Around €5 million per project; other amounts allowed
- Funding: Lump sum; rate up to 70%, non-profits up to 100%
- Who: Any legal entity, in a consortium
- Where: EU Member States, associated countries, OCTs
- Partners: 3+ independent entities, 3 countries, 1+ in the EU
- TRL: No TRL set by the topic
- Duration: Not fixed by the topic
- Effort: High
HORIZON-NEB-2026-01-PARTICIPATION-02 · WP 2026–2027 · run by CINEA
At a glance
A good fit only for a consortium that already has a nearly complete proposal combining spatial design, social science and local partners, with at least three neighbourhoods, located in different Member States and/or Associated Countries, ready for demonstration; the deadline is 1 December 2026, 17:00 Brussels time (18:00 in Romania).
- What it funds: one innovative approach to designing and planning neighbourhood public space, built on co-creation and demonstrated in at least three neighbourhoods in urban, peri-urban and rural areas located in different Member States and/or Associated Countries (the text does not state whether each neighbourhood needs its own country). It must show how design shapes gendered, age-related and identity-related patterns of use, and must deal with climate and water resilience, civil security, biodiversity, users' safety and the multisensory experience of beauty.
- Money: €10 million for around 2 projects, about €5 million each, paid as a lump sum fixed from a detailed budget table. The funding rate is up to 70% (up to 100% for non-profit legal entities) and is already applied inside the lump sum.
- Who can apply: any legal entity, in a consortium of three independent entities from three countries, one of them in an EU Member State. Romanian entities are eligible. Entities established in China cannot take part. The topic text requires the effective contribution of social sciences and humanities (SSH) disciplines and the involvement of SSH experts; building-sector professionals (architects, urban planners, landscape designers) must take part where the work concerns the built environment.
- Who can still use this deadline: a consortium with a written proposal that needs a last check of the rules, or a partner joining in the last days (it needs an EU Login account, a PIC, a place in Part A and a line in the budget table). A team starting from zero should prepare for the next round instead.
- Next round: HORIZON-NEB-2027-01 (planned opening 5 May 2027, deadline 1 December 2027, 17:00 Brussels time) has no topic on public-space design; its two Participation Innovation Actions cover co-governance and intergenerational neighbourhoods. A repeat of this topic is not published. The joint call HORIZON-NEB-2027-02 with the Soil Deal for Europe Mission has one Innovation Action on reducing soil sealing through urban and territorial design (about €7.5 million per project, deadline 15 September 2027); its further call documents are not published.
Key dates
- 5 May 2026 — Call opened
- 1 Dec 2026 — Deadline, 17:00 Brussels (18:00 Romania)
- May 2027 — Results (indicative, about 5 months on)
- 5 May 2027 — Next round opens (planned, 2027-01)
- Aug 2027 — Grant signature (indicative, about 8 months on)
- 1 Dec 2027 — Next round deadline (planned, 2027-01)
Is it for you?
Good fit
- A consortium with a nearly complete proposal and a municipality or site partner for each neighbourhood
- Architecture, urban design and landscape practices that already work with participatory methods
- Municipal planning, mobility and public-space departments able to host a demonstration
- Universities and research bodies in urban sociology, gender studies, environmental psychology, design research and civil security (security-by-design)
- Cultural, creative and educational organisations that run co-creation with residents of different ages and identities
Not a fit
- Single organisations or consortia from fewer than three countries
- Teams with no draft and no site partners yet: the deadline is too close, so prepare for the next round
- Projects that design single buildings or technical infrastructure instead of public space
- A single-site pilot: the topic asks for at least three neighbourhoods located in different Member States and/or Associated Countries
- Consortia that rely on entities established in China in any capacity, subcontractors included
Eligibility checklist
- At least three independent legal entities as beneficiaries, each in a different country: one in an EU Member State, the other two in Member States or Horizon Europe associated countries. Affiliated entities do not count towards the minimum (General Annex B, p. 13).
- One approach, at least three sites: the proposal develops one approach to designing and planning public space that uses innovative methods, and demonstrates it in at least three neighbourhoods. The topic text asks to “Demonstrate the approach in at least three neighbourhoods (in urban, peri-urban and rural areas) located in different Member States and/or Associated Countries” (Part 13, p. 32). It does not state whether this means a different country for each neighbourhood; an applicant who needs certainty should ask CINEA in writing before the deadline. One neighbourhood of each type in a different country is the cautious plan (EUnita interpretation).
- Content the topic lists: an assessment of how spatial design determines gendered, age-appropriate and identity-related patterns of use (mobility, safety, sense of security, access); an analysis of the values, practices and stakeholder relations behind public-space design; co-creation that uses the potential of the cultural, creative and educational sectors; climate resilience, water resilience, civil security and biodiversity; an assessment of multisensory perception, beauty and aesthetics; and plans and recommendations for take-up, including skills needs and gaps.
- A neighbourhood, for the NEB Facility, is an area of at most 25 km² or at most 10,000 inhabitants that is part of, or represents, the lowest level of public administration, such as a quarter, borough or district (Work Programme glossary, p. 16). Urban, peri-urban and rural areas are read from the Eurostat degree-of-urbanisation grid (Portal answer 98594).
- Where a proposal works on the built environment (design, construction, renovation), the Work Programme requires the participation of relevant key building-sector professionals, such as architects, urban planners and landscape designers (Part 13, pp. 6–7). In this topic they are the core users of the results, so they belong in the consortium.
- SSH: the topic text says it “requires the effective contribution of social sciences and humanities (SSH) disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities” (Part 13, pp. 32–33).
- NEB hub: the topic text says “Proposals are expected to allocate at least 0.8% of their budget for engaging with the Horizon Europe-funded 'New European Bauhaus hub for results and impact' to share their intermediate and final results, findings and learning, as well as to contribute to impact assessment” (Part 13, p. 33). Portal answer 102435 adds that the percentage is calculated on the total budget of the project and that there are no specific budget categories or cost headings where these expenses should be allocated.
- Entities established in China cannot take part in any Innovation Action, in any capacity: as beneficiaries, affiliated entities, associated partners, third parties giving in-kind contributions or subcontractors. Exceptions may be granted case by case for justified reasons (General Annexes, Annex B, pp. 6–7). Chinese universities under the Ministry of Industry and Information Technology are excluded from every action.
- TRL: the topic sets none.
- Public bodies, research organisations and higher education establishments (private ones included) from Member States and associated countries that take part as beneficiaries or affiliated entities need a gender equality plan at the moment of grant signature and during the grant. It must cover four minimum process requirements: publication, dedicated resources, data collection and monitoring, and training (General Annex B, p. 17).
- Every participant needs a PIC to submit: beneficiaries, affiliated entities and associated partners. Beneficiaries and affiliated entities are validated at grant preparation; associated partners are not (General Annexes, p. 36).
- Exclusions: entities under EU restrictive measures cannot take part in any capacity, and neither can entities established in Russia, Belarus or non-government controlled territories of Ukraine (exceptions may be granted case by case for justified reasons), nor entities established outside Russia that are directly or indirectly owned for more than 50% by an entity established in Russia (General Annex B, p. 10).
Our take
- Design as a social choice: the topic starts from the idea that the design of public space decides who feels safe, who belongs and who is left out, and asks for an approach that makes this visible and usable by planners.
- Method plus demonstration: the grant pays for developing one design approach and proving it in at least three real neighbourhoods, then writing take-up plans, not only for a design study.
- Room for culture and education: the text names the cultural, creative and educational (academic) sectors as a resource for co-creation, which opens the topic to arts organisations and universities of design.
- Lump sum at up to 70% for companies: the rate is up to 70%, and up to 100% for non-profit legal entities, applied inside the lump sum; a design firm in the consortium plans its own share.
How to win
- If your proposal is already written, use the remaining time for a rules check: one approach, not a menu; at least three neighbourhoods (urban, peri-urban, rural) located in different Member States and/or Associated Countries; the assessment of gendered, age-related and identity-related patterns of use; co-creation; security, climate, water and biodiversity covered; multisensory and aesthetic assessment; take-up plans with skills gaps; the SSH contribution the topic text asks for; at least 0.8% of the budget planned for the NEB hub (expected by the topic); at most 45 pages; a detailed budget table saved as .xlsx. Each submission replaces the previous one, so submit early: the Online Manual advises submitting “as early as possible and at least 48 hours before the deadline” (Online Manual, PDF p. 38). Derived estimate: 48 hours before 1 December 2026, 17:00 Brussels time is Sunday 29 November 2026, 17:00. After the deadline nothing can be corrected, and the General Annexes say deadlines cannot be extended at an applicant's request. A Portal notice of 26 October 2026 says Part A of proposals was moved to a new technology: anyone editing a draft or a submitted proposal should check Part A again, because some data may need to be entered again.
- If a partner is joining late — for example a design practice, a municipality or a cultural organisation for a site or neighbourhood type still missing — it needs an EU Login account and a PIC, a place in Part A and a line in the detailed budget table. The Portal's Partner Search lists organisations looking for a consortium. Public bodies, research organisations and universities from Member States and associated countries must have a gender equality plan at grant signature and during the grant.
- If you are starting from zero, do not rush this deadline. The planned HORIZON-NEB-2027-01 call (opening 5 May 2027, deadline 1 December 2027) has no public-space design topic, and a repeat is not published. Use the months before the next opening to build the consortium and the site agreements, and watch the Portal: the joint soil-sealing topic (deadline 15 September 2027) is the nearest in design terms.
- Secure the sites early. Demonstrating a design approach in public space needs the local authority or owner of the space to agree to test it, and the topic asks for at least three neighbourhoods located in different Member States and/or Associated Countries.
- Put effort into the Impact section: for Innovation Actions its score counts 1.5 times in the ranking (General Annex D, p. 26). For proposals with equal scores the tie-break runs in this order (General Annex F, p. 28): first, proposals that address aspects of the call not covered by more highly ranked proposals have the highest priority; then those proposals are ranked by their Impact score and then their Excellence score; then gender balance among the researchers with a leading role; then geographical diversity (the number of Member States or Associated Countries in the proposal not otherwise receiving funds from projects higher up the ranking list, then budget if equal); last, other factors such as synergies between projects or the involvement of SMEs. Show who will use the approach (planning offices, architects, municipalities) and how.
- Plan co-financing from the start: non-profit legal entities can be funded up to 100%, for-profit partners up to 70%.
Documents to prepare
- Part A (online) and Part B (PDF, at most 45 pages for the title, participants list and sections 1 to 3) in the Funding & Tenders Portal submission system; the Portal form is used, not the standard template
- The detailed budget table (HE LS, Excel): saved as .xlsx for upload, work packages in the same order as in Part B, beneficiaries in the same order as Part A; it fixes the lump sum, and ineligible costs in it can reduce the grant, even later
- A PIC for every participant (beneficiaries, affiliated entities and associated partners), and an EU Login account for each contact person; a partner joining late must be in the Participant Register first
- A work plan that describes the one design approach, the co-creation process in each neighbourhood, the SSH contribution and the involvement of architects, urban planners and landscape designers
- An assessment plan for patterns of use by gender, age and identity, and for multisensory perception and aesthetics, plus take-up recommendations and skills gaps, with the plan for exploitation and dissemination that every application needs
- Resources for engaging with the NEB hub for results and impact: the topic expects at least 0.8% of the budget, calculated on the total project budget (no fixed cost heading; Portal answer 102435)
- A gender equality plan for public bodies, research organisations and higher education establishments from Member States and associated countries that take part as beneficiaries or affiliated entities, valid at grant signature and during the grant
- After selection: legal entity validation (beneficiaries and affiliated entities), a financial capacity check (normally of the coordinator if the requested grant is EUR 500,000 or more; not for public bodies, international organisations or low-value grants of EUR 60,000 or less; possible for other participants if needed), a declaration of honour from each participant and a consortium agreement
Risks to weigh
- Sites: at least three neighbourhoods located in different Member States and/or Associated Countries, with permission from the authorities or owners to test design changes in public space. A site lost late breaks the minimum.
- Breadth: the topic lists many things a proposal must address (patterns of use, co-creation, climate, water, civil security, biodiversity, multisensory perception, take-up plans). Evaluators read the aspects only to the extent the work corresponds to the Work Programme text (General Annex D), so gaps show.
- One approach: the text asks for one approach with innovative methods, replicable and scalable. A bundle of unrelated local pilots would not match it (EUnita reading).
- Competition: around 2 projects are expected for this topic. No applicant figures are published for this call; for the previous round the Commission's info-day slide shows 367 proposals for 25 expected projects (6.8%) across 11 topics.
- Time: the deadline is 1 December 2026, 17:00 Brussels time. It cannot be extended at an applicant's request, and no corrections or resubmissions are possible afterwards. Pages beyond 45 are made invisible.
- China: entities established in China are not eligible in any capacity, subcontractors and in-kind third parties included (exceptions may be granted case by case for justified reasons).
- Lump sum: payment follows completed work packages, so an incomplete work package is not paid until it is completed. The budget table fixes the amount, and ineligible costs in it can reduce the grant, even after the project has ended.
- Dates can move: the Director-General may delay the deadline by up to two months for everyone, and the evaluation and signature dates are only indicative (about 5 and about 8 months after the deadline). Do not plan on a delay.
Official documents
- Official call page
- Where to apply
- Guidelines
- Templates / documents
- Work Programme
- Additional documents
- Full analysis (PDF)
Based on the Horizon Europe Work Programme 2026–2027, Part 13 New European Bauhaus Facility (Decision C(2026) 6687/2 of 29 September 2026, topic text pp. 30–33) and Part 15 General Annexes, the Funding & Tenders Portal topic data and page for HORIZON-NEB-2026-01-PARTICIPATION-02 (published 12 December 2025), the standard application form V5.1 (22 January 2026), the lump-sum model grant agreement V1.0 (1 November 2024), the detailed budget table V3.6, the Online Manual V1.3 (1 May 2026) and the Portal answers 98594 and 102435, checked on 20 November 2026. Official updates prevail. Image: EUnita.