Horizon Europe · NEB Facility · IA · lump sum
Horizon Europe NEB: sustainable, inclusive, affordable and beautiful thermal comfort. An Innovation Action (TRL 5–7) for consortia demonstrating at least two solutions in at least two climatic zones
About €4 million per project to demonstrate at least two thermal-comfort solutions, including on a heritage building. Deadline 1 Dec 2026, 17:00 Brussels.
Status: Closing soon · Deadline: 1 Dec 2026, 17:00 Brussels time
- €4 million — expected EU contribution
- €12 million — topic budget, about 3 projects
- TRL 5–7 — expected at the project end
Call facts
- Grant: Around €4 million per project; other amounts allowed
- Funding: Lump sum; rate up to 70%, non-profits up to 100%
- Who: Any legal entity, in a consortium
- Where: EU Member States, associated countries, OCTs
- Partners: 3+ independent entities, 3 countries, 1+ in the EU
- TRL: Any start TRL; TRL 5–7 expected at the end
- Duration: Not fixed by the topic
- Effort: High
HORIZON-NEB-2026-01-REGEN-01 · WP 2026–2027 · run by CINEA
At a glance
A good fit only for a consortium that already has a nearly complete proposal, at least two tested low-energy thermal-comfort solutions and access to buildings, at least one a cultural heritage building, in at least two climatic zones located in different Member States and/or Associated Countries; the deadline is 1 December 2026, 17:00 Brussels time (18:00 in Romania).
- What it funds: developing and demonstrating at least two solutions for thermal comfort in buildings based on vernacular principles, nature-based solutions, bioclimatic design and/or frugal innovation, on new and/or existing buildings, in at least two different climatic zones located in different Member States and/or Associated Countries (the text does not state whether each climatic zone needs its own country). The proposal evaluates life-cycle emissions and costs against market solutions, ensures access for vulnerable groups and aesthetic appeal, and names barriers to scale-up. Activities may start at any TRL and are expected to reach TRL 5–7.
- Money: €12 million for around 3 projects, about €4 million each, paid as a lump sum fixed from a detailed budget table. The funding rate is up to 70% (up to 100% for non-profit legal entities) and is already applied inside the lump sum.
- Who can apply: any legal entity, in a consortium of three independent entities from three countries, one of them in an EU Member State. Romanian entities are eligible. Entities established in China cannot take part. Because the work is on buildings, the Work Programme requires relevant building-sector professionals to take part; the topic text has no SSH sentence.
- Who can still use this deadline: a consortium with a written proposal that needs a last check of the rules, or a partner joining in the last days (it needs an EU Login account, a PIC, a place in Part A and a line in the budget table). A team starting from zero should prepare for the next round instead.
- Next round: HORIZON-NEB-2027-01 is planned to open on 5 May 2027 with a deadline of 1 December 2027, 17:00 Brussels time. It has no thermal-comfort topic; its building topics are construction materials and techniques (Research and Innovation Action, TRL 4–5), healthy construction and renovation sites (Research and Innovation Action) and enabling environments for a circular construction sector (Innovation Action, TRL 6–8). A repeat of this topic is not published. The joint call HORIZON-NEB-2027-02 with the Soil Deal for Europe Mission has one topic on soil sealing (deadline 15 September 2027, 17:00 Brussels time). The Portal lists the 2027 topics as forthcoming; further call documents are not published.
Key dates
- 5 May 2026 — Call opened
- 1 Dec 2026 — Deadline, 17:00 Brussels (18:00 Romania)
- May 2027 — Results (indicative, about 5 months on)
- 5 May 2027 — Next round opens (planned, 2027-01)
- Aug 2027 — Grant signature (indicative, about 8 months on)
- 1 Dec 2027 — Next round deadline (planned, 2027-01)
Is it for you?
Good fit
- A consortium with a nearly complete proposal, at least two tested solutions and building access in at least two climatic zones
- Architects, bioclimatic designers and building-physics firms that already work with vernacular or frugal techniques
- Makers of nature-based, passive-cooling and low-energy products ready for TRL 5–7 demonstration
- Owners and managers of cultural heritage buildings, and conservation bodies, willing to host a demonstrator
- Research bodies and universities that can run the life-cycle emissions and cost evaluation and monitor thermal comfort
Not a fit
- Single organisations or consortia from fewer than three countries
- Teams with no draft and no building sites yet: the deadline is too close, so prepare for the next round
- Projects that only supply mechanical cooling or heating equipment: the topic asks for vernacular, nature-based, bioclimatic or frugal solutions
- Concept-stage work with no prototype: TRL 5–7 at the end is the expected level
- Consortia that rely on entities established in China in any capacity, subcontractors included
Eligibility checklist
- At least three independent legal entities as beneficiaries, each in a different country: one in an EU Member State, the other two in Member States or Horizon Europe associated countries. Affiliated entities do not count towards the minimum (General Annex B, p. 13).
- Solutions and sites: at least two solutions for thermal comfort in buildings, based on vernacular principles, nature-based solutions, bioclimatic design and/or frugal innovation, demonstrated on new and/or existing buildings, including at least one cultural heritage building, “in at least two different climatic zones located in different Member States and/or Associated Countries” (Part 13, p. 47). The text does not state whether each climatic zone needs its own country; an applicant who needs certainty should ask CINEA in writing before the deadline.
- Evidence: the reduction in life-cycle GHG emissions and life-cycle costs, and the improvement in affordability, compared with the solutions now on the market; accessibility for groups in a vulnerable situation; aesthetic appeal; barriers to implementation, scalability and replicability (including regulation) with recommendations.
- TRL: activities may start at any level and are expected to reach TRL 5–7 by the end (TRL 5: technology validated in a relevant environment; TRL 7: system prototype demonstrated in an operational environment; General Annex B, p. 15).
- Where a proposal works on the built environment (design, construction, renovation), the Work Programme requires the participation of relevant key building-sector professionals, such as architects, urban planners and landscape designers (Part 13, pp. 6–7).
- The text has no social sciences and humanities (SSH) sentence, unlike most other topics of the call. It still asks for a participatory and transdisciplinary approach.
- Synergies are to be explored with other initiatives such as the EU Mission on Adaptation to Climate Change, in particular the topic HORIZON-MISS-2025-01-CLIMA-04 on extreme heat. This is a recommendation, not a condition.
- NEB hub: the topic text says “Proposals are expected to allocate at least 0.8% of their budget for engaging with the Horizon Europe-funded 'New European Bauhaus hub for results and impact' to share their intermediate and final results, findings and learning, as well as to contribute to impact assessment” (Part 13, p. 47). Portal answer 102435 adds that the percentage is calculated on the total budget of the project and that there are no specific budget categories or cost headings where these expenses should be allocated.
- Entities established in China cannot take part in any Innovation Action, in any capacity: as beneficiaries, affiliated entities, associated partners, third parties giving in-kind contributions or subcontractors. For this destination the Work Programme says so in terms for both RIAs and IAs (Part 13, p. 45; General Annexes, Annex B, pp. 6–7). Exceptions may be granted case by case for justified reasons. Chinese universities under the Ministry of Industry and Information Technology are excluded from every action.
- Public bodies, research organisations and higher education establishments (private ones included) from Member States and associated countries that take part as beneficiaries or affiliated entities need a gender equality plan at the moment of grant signature and during the grant. It must cover four minimum process requirements: publication, dedicated resources, data collection and monitoring, and training (General Annex B, p. 17).
- Every participant needs a PIC to submit: beneficiaries, affiliated entities and associated partners. Beneficiaries and affiliated entities are validated at grant preparation; associated partners are not (General Annexes, p. 36).
- Exclusions: entities under EU restrictive measures cannot take part in any capacity, and neither can entities established in Russia, Belarus or non-government controlled territories of Ukraine (exceptions may be granted case by case for justified reasons), nor entities established outside Russia that are directly or indirectly owned for more than 50% by an entity established in Russia (General Annex B, p. 10).
- Hungarian public interest trusts: General Annex B, p. 10 still names the measures of 2022; Council Implementing Decision (EU) 2026/2324 of 13 October 2026 lifted them and repealed Implementing Decision (EU) 2022/2506 (Official Journal of 21 October 2026); an entity of this kind should check the Portal or ask CINEA before submitting.
Our take
- Cooling and comfort without air conditioning: the topic targets buildings with poor thermal resilience, where comfort normally relies on energy-intensive air conditioning that adds emissions, costs and urban heat.
- Proof on real buildings, including heritage: at least one demonstrator must be a cultural heritage building, which brings in conservation constraints and owners.
- A cost test: the solutions are judged on life-cycle emissions and cost against market solutions, so building-cost and energy-modelling data matter as much as the design.
- A moderate TRL ladder: TRL 5–7 at the end suits tested prototypes and early products rather than concepts or fully commercial systems.
- Lump sum with a catch for companies: the rate is up to 70%, and up to 100% for non-profit legal entities, applied inside the lump sum.
How to win
- If your proposal is already written, use the remaining time for a rules check: at least two solutions based on vernacular, nature-based, bioclimatic or frugal approaches; at least two climatic zones located in different Member States and/or Associated Countries; at least one cultural heritage building; life-cycle GHG and cost evaluation against market solutions; accessibility and aesthetics; barriers and recommendations; TRL 5–7 at the end; at least 0.8% of the budget planned for the NEB hub (expected by the topic); at most 45 pages; a detailed budget table saved as .xlsx. Each submission replaces the previous one, so submit early: the Online Manual advises submitting “as early as possible and at least 48 hours before the deadline” (Online Manual, PDF p. 38). Derived estimate: 48 hours before 1 December 2026, 17:00 Brussels time is Sunday 29 November 2026, 17:00. After the deadline nothing can be corrected, and the General Annexes say deadlines cannot be extended at an applicant's request. A Portal notice of 26 October 2026 says Part A of proposals was moved to a new technology: anyone editing a draft or a submitted proposal should check Part A again, because some data may need to be entered again.
- If a partner is joining late — for example a building owner or designer in a climatic zone or heritage building the consortium still lacks, or a partner who can run life-cycle cost and emissions calculations — it needs an EU Login account and a PIC, a place in Part A and a line in the detailed budget table. The Portal's Partner Search lists organisations looking for a consortium. Public bodies, research organisations and universities from Member States and associated countries must have a gender equality plan at grant signature and during the grant.
- If you are starting from zero, do not rush this deadline. HORIZON-NEB-2027-01 (planned opening 5 May 2027, deadline 1 December 2027) has no thermal-comfort topic, and a repeat is not published. Its building topics are different: construction materials and techniques (TRL 4–5), construction and renovation sites, and enabling environments for a circular construction sector (TRL 6–8). Use the months before the next opening to build the consortium and to collect monitoring data on your solutions.
- Place the climatic zones and the heritage building first. Heritage owners and authorities need time to agree to a demonstration, and the choice of climatic zones must be argued with climate data.
- Put effort into the Impact section: for Innovation Actions its score counts 1.5 times in the ranking (General Annex D, p. 26). For proposals with equal scores the tie-break runs in this order (General Annex F, p. 28): first, proposals that address aspects of the call not covered by more highly ranked proposals have the highest priority; then those proposals are ranked by their Impact score and then their Excellence score; then gender balance among the researchers with a leading role; then geographical diversity (the number of Member States or Associated Countries in the proposal not otherwise receiving funds from projects higher up the ranking list, then budget if equal); last, other factors such as synergies between projects or the involvement of SMEs. Show the market route for the solutions and the cost advantage.
- Plan co-financing from the start: non-profit legal entities can be funded up to 100%, for-profit partners up to 70%.
Documents to prepare
- Part A (online) and Part B (PDF, at most 45 pages for the title, participants list and sections 1 to 3) in the Funding & Tenders Portal submission system; the Portal form is used, not the standard template
- The detailed budget table (HE LS, Excel): saved as .xlsx for upload, work packages in the same order as in Part B, beneficiaries in the same order as Part A; it fixes the lump sum, and ineligible costs in it can reduce the grant, even later
- A PIC for every participant (beneficiaries, affiliated entities and associated partners), and an EU Login account for each contact person; a partner joining late must be in the Participant Register first
- A work plan with at least two solutions, the demonstration buildings (at least one a cultural heritage building) in at least two climatic zones, the monitoring of thermal comfort and the life-cycle emissions and cost evaluation
- A barrier and replication analysis, including regulation, with the plan for exploitation and dissemination that every application needs
- Resources for engaging with the NEB hub for results and impact: the topic expects at least 0.8% of the budget, calculated on the total project budget (no fixed cost heading; Portal answer 102435)
- A gender equality plan for public bodies, research organisations and higher education establishments from Member States and associated countries that take part as beneficiaries or affiliated entities, valid at grant signature and during the grant
- After selection: legal entity validation (beneficiaries and affiliated entities), a financial capacity check (normally of the coordinator if the requested grant is EUR 500,000 or more; not for public bodies, international organisations or low-value grants of EUR 60,000 or less; possible for other participants if needed), a declaration of honour from each participant and a consortium agreement
Risks to weigh
- Sites: at least two climatic zones located in different Member States and/or Associated Countries, and at least one cultural heritage building. A heritage owner or authority that withdraws late can break the topic's demonstration requirement.
- Evidence: life-cycle GHG and cost reductions must be shown against solutions now on the market. Weak baselines or missing monitoring data weaken the Impact case.
- Breadth: the text asks for at least two solutions, accessibility for vulnerable groups, aesthetics and a barrier analysis. Evaluators read the aspects only to the extent the work corresponds to the Work Programme text (General Annex D).
- Competition: around 3 projects are expected for this topic. No applicant figures are published for this call; for the previous round the Commission's info-day slide shows 367 proposals for 25 expected projects (6.8%) across 11 topics.
- Time: the deadline is 1 December 2026, 17:00 Brussels time. It cannot be extended at an applicant's request, and no corrections or resubmissions are possible afterwards. Pages beyond 45 are made invisible.
- China: entities established in China are not eligible in any capacity, subcontractors and in-kind third parties included (exceptions may be granted case by case for justified reasons).
- Lump sum: payment follows completed work packages, so an incomplete work package is not paid until it is completed. The budget table fixes the amount, and ineligible costs in it can reduce the grant, even after the project has ended.
- Dates can move: the Director-General may delay the deadline by up to two months for everyone, and the evaluation and signature dates are only indicative (about 5 and about 8 months after the deadline). Do not plan on a delay.
Official documents
- Official call page
- Where to apply
- Guidelines
- Templates / documents
- Work Programme
- Additional documents
- Full analysis (PDF)
Based on the Horizon Europe Work Programme 2026–2027, Part 13 New European Bauhaus Facility (Decision C(2026) 6687/2 of 29 September 2026, topic text pp. 46–47) and Part 15 General Annexes, the Funding & Tenders Portal topic data and page for HORIZON-NEB-2026-01-REGEN-01 (published 12 December 2025), the standard application form V5.1 (22 January 2026), the lump-sum model grant agreement V1.0 (1 November 2024), the detailed budget table V3.6, the Online Manual V1.3 (1 May 2026) and the Portal answer 102435, checked on 20 November 2026. Official updates prevail. Image: EUnita.