Single Market Programme · Euroclusters · FSTP
RENEW-BOOSTER Call 2: PV, offshore wind and grid projects for SMEs
Up to €60,000 per SME, matched by the SME’s own cash, to pilot or develop PV, offshore wind and energy-grid solutions.
Status: Closing soon · Deadline: 30 Nov 2026, 17:00 CET
- €60,000 — cap per SME, all calls
- Own cash — co-funding is mandatory
- 3–6 months — Strand B project length
Call facts
- Grant: A: €10,000, then €50,000. B: €10,000, €30,000 or €60,000
- Funding: Own cash: A 20% then 40%; B 50–70% on Graph 2
- Who: SMEs in PV, offshore wind or energy grids
- Where: EU-27 + SMP countries, incl. Romania
- Partners: Strand A alone; Strand B alone or up to 3 SMEs
- TRL: 6–7 (FAQ: around TRL 6 and up)
- Duration: A: 3 weeks, then 12 weeks. B: up to 6 months
- Effort: Medium
GA 101234706 · Call 2, Strands A and B
At a glance
- What it funds: clean-energy supply-chain projects in offshore wind (floating in particular), photovoltaics and energy grids, plus digital and environmental tools for them. Strand A is a two-stage competition on four set industry challenges; Strand B is an open call.
- Who can apply: a single SME from the EU-27 or another Single Market Programme country, Romania included. Strand B also accepts consortia of up to three SMEs.
- How it pays: Strand A pays €10,000, then €50,000 for one winner per challenge, each on signature of that stage’s agreement. Strand B pays 50% within 30 days of signature and the balance within 30 days of validation of the last milestone.
- The catch: every euro of grant needs the SME’s own private cash beside it; in-kind contributions and staff time do not count. The project must also show explicit alignment with the Net-Zero Industry Act (NZIA) and/or the Critical Raw Materials Act (CRMA).
- The odds: Call 1 received 85 applications and funded 14, according to a partner announcement. In Strand A, only one of three SMEs per challenge reaches the €50,000 stage. Call 2 has €800,000 according to partner announcements; the call text states no total or split between the strands. The consortium may leave funds unawarded or move them between calls.
Key dates
- 28 Sep 2026 — Call opened
- 27 Nov 2026 — Our tip: submit by this date
- 30 Nov 2026 — Deadline, 17:00 CET
- Jan 2027 — Results mid-month, contracts at end (expected)
Is it for you?
Good fit
- SMEs making components, materials, power electronics, software or services for PV, offshore wind or grids, at TRL 6 or above
- SMEs whose product secures or cuts a critical material (silica, neodymium, copper, tin, lead) or moves supply-chain steps into the EU, with numbers to prove it
- Grid and digital SMEs working on SF6-free equipment, recycled-material cables, cable monitoring, dynamic line rating, predictive maintenance, AI, digital twins, energy management or environmental-impact tools, with a pilot partner ready
- Robotics, welding-automation, battery-diagnostics or resilient-positioning SMEs that closely match one of the four Strand A challenges
- SMEs with own cash to match the grant, alone or in a group of up to three with separated tasks (Strand B)
Not a fit
- Large companies, universities, research organisations and individuals: only SMEs can apply
- SMEs that can co-fund only with staff time or in-kind contributions: co-funding must be own cash on non-personnel costs
- Projects below TRL 6 or without a clear link to the PV, offshore wind or energy-grid value chains
- SMEs that received RENEW-BOOSTER funding in Call 1, until the consortium confirms in writing that they may apply
- Applicants that cannot state a concrete contribution to NZIA or CRMA, or whose work needs more than €60,000 or six months
Eligibility checklist
- The applicant is an SME under Recommendation 2003/361: fewer than 250 staff and turnover up to €50 million or balance sheet up to €43 million. Linked and partner enterprises count where relevant.
- It is established in the EU-27 or another Single Market Programme country: Albania, Bosnia and Herzegovina, Kosovo, Moldova, Montenegro, North Macedonia, Serbia, Türkiye, Ukraine, Norway, Iceland or Liechtenstein. Romania is eligible.
- It has sufficient operational capacity and is active in the PV, offshore wind or energy-grid value chain. It is not in liquidation, in difficulty or excluded from EU funding, and has no conflict of interest with the RENEW-BOOSTER partners. Every gate is checked before scoring, and an incomplete application may be rejected.
- One application per strand per SME; one in each strand only if the activities are distinct and nothing is funded twice. Consortia of up to three SMEs are allowed in Strand B only, with no partner below 20% of the budget. Each SME must meet the co-funding rule on its own.
- No SME receives more than €60,000 across all RENEW-BOOSTER calls. A Strand A winner reaches the cap alone, so a Strand B grant on top may have no room under it. The form calls Call 1 grantees ‘not eligible to apply for second round’; the call text sets only the cap.
- Co-funding is the SME’s own private cash, from own funds or debt: never in-kind contributions, salaries or staff time. It is checked at application and again at reporting, and without an adequate co-funding table the application is not considered.
- Minimum co-funding: Strand A 20% (Stage 1) and 40% (Stage 2). Strand B is contradictory: about 30% rising to 50% in the call text. Graph 2 shows 70%, 60% and 50% for the €10,000, €30,000 and €60,000 tiers; plan on Graph 2.
- The project shows explicit alignment with NZIA and/or CRMA, respects EU values and Do No Significant Harm, and excludes costs funded from another public source. TRL is 6–7 in the call text, ‘around TRL 6 and up’ in the FAQ.
Our take
- A short route to a real step: one SME, a short EUSurvey form and results in mid-January 2027, for a pilot or demonstration at TRL 6 or above. Most clean-energy funding needs large consortia or long Horizon Europe, Innovation Fund or EIC applications.
- The policy anchor is specific: the call says NZIA and CRMA will be of peak importance in every evaluation. It names silica, neodymium and copper supply, less tin and lead, SF6-free grid equipment, cables from recycled materials and value-chain steps moved into the EU.
- Romania helps at the margin: as an EU-13 country outside the partnership, its SMEs fall within the at least 10% of supported SMEs reserved for other EU regions. The call promises specific attention, not a quota.
- Cash is the real price: on the stricter reading a €10,000 Strand B grant needs €23,000 of own cash. Strand A also puts a small company in front of a named challenge owner. These are EDF power solutions, Navacel, Estabanell Impulsa and PGE Baltica, and the contact can be worth as much as the grant.
How to win
- Write one paragraph on how the project serves NZIA or CRMA, in numbers. Examples: tonnes of critical material avoided, tonnes of CO2 saved, or a component made in Europe instead of imported.
- Choose the strand on purpose. Strand A fits only if your product answers one of the four challenges almost exactly. Strand B is the default, with the tier following maturity from prototype to deployment.
- Write to the helpdesks before committing: nicolas.lemonnier@capenergies.fr for the Strand B co-funding rates, and bes@energycluster.dk if you received RENEW-BOOSTER funding in Call 1. Until answered, budget on Graph 2: €23,000 of own cash at the €10,000 tier, €45,000 at €30,000 and €60,000 at €60,000.
- Write for the three criteria, Excellence, Impact and Implementation, each scored out of 10 with a threshold of 6; Impact decides ties. Use measurable indicators from the form’s list and keep the work plan to five tasks that fit three to six months. Build the co-funding table from materials, equipment, prototypes, testing and external services, never salaries.
- Register the PIC and sign the Financial Identification form early. Submit by 27 November: the deadline is 17:00 CET on Monday 30 November 2026, which is 18:00 in Bucharest.
Documents to prepare
- Online application in English on EUSurvey (form v1.7): scope fit (150 words), summary (2,000 characters), Excellence, Impact and Implementation answers
- A 9-digit PIC from the EU Participant Register for every SME involved
- Financial Identification form, completed, signed and uploaded
- Staff numbers, turnover and balance-sheet total for the latest closed year, with linked and partner data
- Work plan of up to five tasks with dates, resources, deliverables and KPIs, with at least two indicators from the form’s list
- Two budget tables: grant budget per SME and co-funding budget in own cash, with no in-kind or personnel costs
- Signed declarations: SME status, financial stability, operational capacity, DNSH, research integrity, terms, privacy and consent to publication
- Strand B consortia: an Annex 1 partner window per SME (PIC, legal name, contact, website, address, VAT number, cluster membership, profile, role) and partner consent
Risks to weigh
- The Strand B co-funding rate is contradictory: about 30% to 50% in the call text, 70%, 60% and 50% in Graph 2. An application without an adequate co-funding table is not considered.
- The form calls earlier RENEW-BOOSTER beneficiaries ‘not eligible to apply for second round’, while the call text only sets a €60,000 cumulative cap.
- Only own cash on non-personnel costs counts as co-funding, checked at application and again at reporting. Depreciation and recoverable VAT are ineligible.
- Strand B pays 50% within 30 days of signature and the balance after the last deliverable is validated. At the €60,000 tier the SME carries €90,000 of spend until then.
- Strand A stages of about three weeks and 12 weeks do not fit the 3-to-6-month project duration in the call text and form. Dates after the deadline are indicative. Projects run from signature, and spending before it is not addressed: spend nothing before signature.
Official documents
- Official call page
- Where to apply
- Guidelines
- Templates / documents
- Work Programme
- Additional documents
- Full analysis (PDF)
Based on the Call 2 call text, EUSurvey form v1.7, Strand A challenges and FAQ, checked on 6 October 2026; the official call page was rechecked on 12 October 2026. Official updates prevail.